EPRO RFQ – Mandatory Collections

EPRO RFQ – Mandatory Collections

EPRO RFQ – Mandatory Collections

Mandatory Completion Requirements for Each Collection


Purpose

As a transport procurement manager, you may want to define mandatory completion requirements for each collection within an RFQ. This ensures that suppliers provide all required information, reduces the need for manual follow-up, and supports a more efficient procurement process.


Explanation

To display the Mandatory column, the Vertical Cherry Picking option must be enabled in the RFQ.

In the RFQ > Rates tab, a new Mandatory column is available with a slider. By default, this slider is disabled for all collections. To mark a collection as mandatory, the slider must be enabled.


If Vertical Cherry Picking is disabled in an RFQ, all collections are automatically set to mandatory, and the column is not editable.

When an RFQ is cloned or a Next Round is created, the value of the Mandatory column is carried over.



Supplier Side

A mandatory collection is marked with a small exclamation icon and a tooltip to make it clear to suppliers.


When the Mandatory option is enabled for a collection, the supplier must provide a valid quote for all lanes in that collection. If this is not done, the Submit button will remain disabled.

If an RFQ contains more than one collection and only one of them is marked as mandatory, the supplier must provide a complete and valid quote only for the mandatory collection. The other non-mandatory collections may be quoted partially, fully, or not at all, according to the existing behaviour.



Special Case

For mandatory collections with rate options, at least one rate per lane must be valid. It is not necessary for all optional rates to be valid.

    • Related Articles

    • Tender RfQ Preparation

      Tender RfQ Preparation This article describes the tender preparation process and guides you through all the tabs available in the Create RfQ dialog. To start a tender, click Start RfQ under Requests in the top menu bar. This will open a new dialog ...
    • RfQ Supplier Status Overview

      RfQ Supplier Status Overview Here is an overview of the icons displayed in the Status column and their meanings: New: The supplier has not yet opened the RfQ. Opened: The supplier has opened the RfQ, if required, accepted the NDA. Downloaded: The ...
    • Close and Archive an RfQ

      Close and Archive an RfQ Steps to Close an RFQ Prerequisites: Before closing an RFQ, make sure that: The RFQ status is Finished (no active bidding and all required approvals have been completed). You have the necessary permissions. Required RfQ ...
    • CHECKLIST: Starting a Tender/RfQ

      Checklist: Starting a Tender / RFQ Step-by-Step Guide Checkting to Launching an RFQ Tender Before launching a tender or RFQ (Request for Quotation), it is essential to ensure that all mandatory requirements are in place and that the data is accurate ...
    • How to Start a Second Round of an RFQ/Tender

      How to Start a Second Round of an RFQ/Tender To launch a second round of an RFQ, follow these steps: Navigate to the eProcurement module and select RfX. Right-click on the finished Tender/RFQ, then select New > Next Round. Follow the instructions in ...